TRANSMISSION & DISTRIBUTION

Contract

Year

Description of Services Location CLIENT
1. 2008 Installation 6,8 KM – 20 KV Power Cable

Package 1 / 05

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

2. 2008 Installation 8 KM – 20 KV Power Cable

Package 1 / 06

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

3. 2008 Installation 14 KM – 20 KV Power Cable

Package 1 / 012

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

4. 2010 Installation 14 KM – 20 KV Power Cable

Jalur : GI Teluk Naga / P. Baru – MPS 1

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

5. 2011 SKTM – JTM 20 kV

Area Bandengan

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

6. 2012 Supply & Installation – Line Bay 150 kV

Gardu Induk

Joint Operation with PT. Hasta Prajatama

GI Maninjau

GI Padang Luar

PT. PLN (Persero)

Penyaluran & Pusat Pengatur

Beban Sumatera (P3BS)

7. 2016 Supply & Installation – Busbar Protection

PLTU Jeranjang

PLTU Jeranjang PT PLN (Persero) Unit Induk Pembangunan – Mataram