NEW POWER PLANT
More than 50 diesel engines in various brand of engine builders and range capacity of 1 to 10 MW has been installed around Indonesia territory. Most of them are executed by BPSA who acting as a sub-contractor.
RELOCATION
specific power plant site work. We could say that, because the work you have to do is an intercourse job between how to dismantle the diesel engine and its all auxiliaries from one power plant and to re-erect it to the other power plant on the different location. Some engines maybe not less than 10 years old. So, you have to be carefull to do all the jobs because at the end, the performance of the engine itself should be optimize according to the needs of your customer.
MARINE INSTALLATION
Under supervising of our qualified engineer, to built a marine diesel engine on your ship is not a crucial problem. Call us to prove it.