ENGINE MAINTENANCE, REHABILITATION & REPAIR

 

LOCATION Q’TY ENGINE

BRAND & TYPE

Type of
Services
CLIENT OWNER
1991
1. PLTD Tarahan

Bandar Lampung

1 unit SULZER 12 ZV 40/48 Rehabilitation PT. PLN (Persero)

Pusat – Jakarta

PT. PLN (Persero)

Wilayah IV

1992
2. PLTD Tanjung Enim

Bukit Asam

2 units SULZER 12 ZV 40/48

Unit No. 1 and 2

Rehabilitation PT. PLN (Persero)

Wilayah IV

PT. PLN (Persero)

Wilayah IV

3. PLTD Teluk Betung

Lampung

1 unit SULZER 12 ZV 40/48 Rehabilitation PT. PLN (Persero)

Wilayah IV

PT. PLN (Persero)

Wilayah IV

1993
4. PLTD Ampenan Lombok 1 unit SULZER 12 ZV 40/48 Rehabilitation New Sulzer Diesel

France SA (NSDF)

PT. PLN ( Persero)

Wilayah XI

1994
5. PLTD Silae Palu 2 units SULZER 12 ZAV 40S Semi Overhaul PT. PLN (Persero)

Wilayah VII

PT. PLN (Persero)

Wilayah VII

6. PLTD Teluk Lembu

Pekanbaru

6 units SULZER 12 ZV 40/48 Rehabilitation PT. PLN (Persero)

Sektor Pekanbaru

PT. PLN ( Persero)

Wilayah III

1995
7. PLTD Simpang Haru

Padang

2 units SULZER 12 ZV 40/48 Periodic Maint. PT. PLN (Persero)

Wilayah III

PT. PLN (Persero)

Wilayah III

8. PLTD Teluk Lembu Pekanbaru 6 units SULZER 12 ZV 40/48 Periodic Maint. PT. PLN (Persero)

Sektor Pekanbaru

PT. PLN (Persero)

Wilayah III

9. PLTD Teluk Lembu Pekanbaru 2 units SULZER 12 ZAV 40S Semi Overhaul PT. PLN (Persero)

Sektor Pekanbaru

PT. PLN (Persero)

Wilayah III

10. PLTD Silae Palu 2 units SULZER 12 ZAV 40S Semi Overhaul PT. PLN (Persero)

Wilayah VII

PT. PLN (Persero)

Wilayah VII

11. PLTD Lueng Bata

Banda Aceh

1 unit SULZER 12 ZV 40/48 Rehabilitation PT. PLN (Persero)

Wilayah I

PT. PLN (Persero)

Wilayah I

1996
12. PLTD Ampenan Lombok 4 units SULZER 12 ZAV 40S Periodic Maint. PT. PLN (Persero)

Wilayah XI

PT. PLN (Persero)

Wilayah XI

13. PLTD Sei Raya Pontianak 2 units SULZER 12 ZAV 40S Periodic Maint. PT. PLN (Persero)

Wilayah V

PT. PLN (Persero)

Wilayah V

14. PLTD Siantan Pontianak 2 units SULZER 12 ZV 40/48 Periodic Maint. PT. PLN (Persero)

Wilayah V

PT. PLN (Persero)

Wilayah V

15. PLTD Teluk Lembu

Pekanbaru

4 units SULZER 12 ZV 40/48 Periodic Maint. PT. PLN (Persero)

Sektor Pekanbaru

PT. PLN (Persero)

Wilayah III

16. PLTD Silae Palu 2 units SULZER 12 ZAV 40S

Unit No. 8 & 9

Major Overhaul PT. PLN (Persero)

Wil. Sulut-Teng

PT. PLN (Persero)

Wilayah Sulut-Teng

17. PLTD Simpang Haru

Padang

2 units SULZER 12 ZV 40/48

Unit No. 1 &  2

Rehabilitation PT. PLN (Persero)

Sektor Padang

PT. PLN (Persero)

Wilayah III

18. PLTD Lueng Bata

Banda Aceh

1 unit SULZER 12 ZV 40/48 Rehabilitation PT. PLN (Persero)

Sektor Lueng Bata

PT. PLN (Persero)

Wilayah I

19. PLTD Lueng Bata

Banda Aceh

1 unit SULZER 12 ZV 40/48 Rehabilitation PT. PLN (Persero)

Pusat – Jakarta

PT. PLN (Persero)

Wilayah I

1998
20. PLTD Lueng Bata

Banda Aceh

1 unit SULZER 12 ZV 40/48

Unit No. 6

Rehabilitation PT. PLN (Persero)

Sektor Lueng Bata

PT. PLN (Persero)

Wilayah I

2000
21. PT. Semen Andalas Indonesia 1 unit Niigata PIELSTICK

PC 2.5 – 6,2 mW

Periodic Maint. PT. Selamat

Sejahtera

PT. Semen

Andalas Indonesia

2001
22. PLTD Pesanggaran

Denpasar, Bali

1 unit SWD 12 TM 410

Unit No. 8

Rehabilitation PT. PLN (Persero) UBP Bali PT. Indonesia Power
2002
23. PLTD Ampenan – Lombok 1 unit SULZER 12 ZV 40/48

Unit No. 1

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

24. PLTD Ampenan – Lombok 1 unit SULZER 12 ZAV 40S

Unit No. 5

Semi Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

25. PLTD Ampenan – Lombok 1 unit SULZER 12 ZV 40/48

Unit No. 2

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

26. PLTD Sei Kledang Samarinda 2 units SULZER 12 ZV 40/48

Unit No. 5 & 6

Rehabilitation PT. PLN (Persero) UBJP – Bandung PT. PLN (Persero)

Sektor Mahakam

2003
27. PLTD Paokmotong

Lombok Timur

1 unit SULZER 12ZV 40/48

Unit No. 2

Semi Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

28. PT. Apac Inti Corpora

Bawen – Semarang

5 units SULZER 16 ZAV 40S Semi Overhaul PT. Vitadaya

Harapan (VDH)

PT. Vitadaya

Harapan (VDH)

29. PLTD Paokmotong Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 5

Repair

Vib. Damper

PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

30. PLTD Ampenan

Lombok Barat

1 unit SULZER 12 ZAV 40S

Unit No. 7

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

31. PLTD Lueng Bata

Banda Aceh

1 unit SULZER 12 ZV 40/48

Unit No. 6

Rehabilitation PT. PLN (Persero)

Sektor Lueng Bata

PT. PLN (Persero)

Wilayah I

32. PT. Dan Liris

Power-house, Solo

1 unit SWD – 9 FFHD 240 Rehabilitation PT. Dan Liris

Garment Factory

PT. Dan Liris
33. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 5

Repair PT. PLN (Persero) Unit Bisnis Jasa & Produksi (UBJP) PT. PLN (Persero) Wilayah VI

Sektor Mahakam

34. PLTD Teluk Lembu

Pekanbaru

1 unit SULZER 12 ZAV 40S

Unit No. 9

Rehabilitation PT. PLN (Persero) UBJP – Bandung PT. PLN (Persero) Sektor Pekanbaru
2004
35. PLTD Silae Palu 1 unit SULZER 12 ZAV 40S

Unit No. 8

Major Overhaul

Replace radiator

CV. Sulut Elektrik PT. PLN (Persero)

Wilayah Suluttenggo

36. PLTD Siantan Pontianak 1 unit SULZER 12 ZV 40/48

Unit No. 1

Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kal-Bar

37. PLTD Siantan Pontianak 1 unit SULZER 12 ZV 40/48

Unit No. 2

Semi Overhaul

Replace baseplate

PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kal-Bar

38. PLTD Silae Palu 1 unit SULZER 12 ZAV 40S

Unit No. 9

Top Overhaul CV. Klabat Utama PT. PLN (Persero)

Wilayah Suluttenggo

39. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 7

Part’s replacement PT. PLN (Persero) Sektor Mahakam PT. PLN (Persero) Wilayah Kaltim
2005
40. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 6

Semi O/haul

Grinding

PT. PLN (Persero)

Sektor Mahakam

PT. PLN (Persero)

Wilayah Kaltim

41. PLTD Silae Palu 1 unit SULZER 12 ZAV 40S

Unit No. 8

Top Overhaul CV. Sulut Elektrik PT. PLN (Persero)

Wilayah Suluttenggo

42. PLTD Paokmotong Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 4

Semi Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

43. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 7

Major Overhaul PT. Bangun

Aquanindo Abadi

PT. PLN (Persero)

Wilayah Kaltim

44. PLTD Siantan Pontianak 1 unit SULZER 12 ZV 40/48 Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

45. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 6

Repair PT. PLN (Persero) Sektor Mahakam PT. PLN (Persero) Wilayah Kaltim
46. PLTD Ampenan Lombok 1 unit SULZER 12 ZAV 40S

Unit No. 5

Up-rating PT. PLN (Persero) Sektor Lombok PT. PLN (Persero)

Wilayah NTB

47. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 5

Rehabilitation, ba-se-plate regroute CV. Surya Sakti PT. PLN (Persero)

Sektor Mahakam

2006
48. PLTD Paokmotong Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 2

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

49. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 6

Top Overhaul PT. PLN (Persero)

Sektor Mahakam

PT. PLN (Persero)

Wilayah Kaltim

50. PLTD Ampenan Lombok Barat 7 units SULZER 12 ZV 40/48

SULZER 12 ZAV 40S

Niigata 12 PC 2,5V

Engine modificati-on for MFO fuel PT. PLN (Persero) Sektor Lombok PT. PLN (Persero)

Wilayah NTB

51. PLTD Ampenan

Lombok Barat

1 unit SULZER 12 ZV 40/48

Unit No. 3

Rehabilitation

Baseplate replace

PT. PLN (Persero) Sektor Lombok PT. PLN (Persero)

Wilayah NTB

2007
52. PLTD Teluk Lembu

Pekanbaru

1 unit SULZER 12 ZAV 40S

Unit No. 9

Top Overhaul CV. Crypton Abadi PT. PLN (Persero)

Sektor Pekanbaru

53. PLTD Ampenan Lombok  Barat 1 unit SULZER 12 ZAV 40S

Unit No. 8

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

54. PLTD Paokmotong

Lombok  Timur

1 unit SULZER 12 ZV 40/48

Unit No. 5

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

55. PLTD Paokmotong

Lombok Timur

1 unit SULZER 12 ZV 40/48

Unit No. 4

Base plate  replacement PT. PLN (Persero) Sektor Lombok PT. PLN (Persero)

Wilayah NTB

56. PLTD Pesanggaran

Denpasar – Bali

1 unit SWD 12 TM 410

Unit No. 9

Rehabilitation

Baseplate Regrout

PT. PLN (Persero)

UBP Bali

PT. Indonesia Power
2008
57. PT. Apac Inti Corpora Bawen, Semarang 4 units SULZER 16 ZAV 40S 60000 RH Overhaul PT. Vitadaya

Harapan (VDH)

PT. Vitadaya

Harapan (VDH)

58. PLTD Ampenan Lombok Barat 1 unit SULZER 12 ZAV 40S

Unit No. 5

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

59. PLTD Paokmotong Lombok Barat 1 unit SULZER 12 ZV 40/48

Unit No. 4

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

60. PLTD Ampenan Lombok Barat 1 unit SULZER 12 ZAV 40S

Unit No. 6

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

61. PLTD Karang Asam

Samarinda

1 unit SULZER 12 ZAV 40S

Unit No. 8

Semi Overhaul PT. PLN (Persero)

Sektor Mahakam

PT. PLN (Persero)

Wilayah Kaltim

62. PLTD Paokmotong Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 4

Grinding PT. PLN (Persero) Sektor Lombok PT. PLN (Persero)

Wilayah NTB

2009
63. PLTD Paokmotong Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 2

Major O-haul

Baseplate replace

PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

64. PLTD Paokmotong

Lombok Timur

1 unit SULZER 12 ZV 40/48

Unit No. 2

Grinding PT. PLN (Persero) Sektor Lombok PT. PLN (Persero)

Wilayah NTB

65. PLTD Sei Kledang Samarinda 2 units SULZER 12 ZV 40/48

Unit No. 5 & 7

Repair Governor PT. PLN (Persero) Sektor Mahakam PT. PLN (Persero) Wilayah Kaltim
2010
66. PLTD Silae – Palu 1 unit SULZER 12 ZAV 40S

Unit No. 9

Major Overhaul PT. PLN (Persero)

Cabang Palu

PT. PLN (Persero)

Wilayah Suluttenggo

67. PLTD ADAU

Sei Raya – Pontianak

5 units SULZER 16 ZAV 40S Top-Semi-Major

Overhaul, during re-installation

PT. Arti Duta Aneka Usaha PT. Vitadaya Harapan (VDH
2011
68. PLTD Silae – Palu 1 unit SULZER 12 ZAV 40S

Unit No. 10 (Hitachi)

Major Overhaul PT. PLN (Persero)

Cabang Palu

PT. PLN (Persero)

Wilayah Suluttenggo

69. PLTD Sei Kledang

Samarinda

1 unit SULZER 12 ZV 40/48

Unit No. 5

Top Overhaul PT. PLN (Persero)

Sektor Mahakam

PT. PLN (Persero)

Wilayah Kaltim

70. PLTD Sei Kledang Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 7

Grinding c/pin journal PT. PLN (Persero)

Sektor Mahakam

PT. PLN (Persero)

Wilayah Kaltim

71. PLTD Paokmotong – Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 5

Major O-haul

Baseplate replace

PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

72. Batam 2 units MAN 18V 40/45 Overhaul

Supervision

PT. Infra

International

—-
73. PLTD Ampenan – Lombok Barat 1 unit SULZER 12 ZAV 40S

Unit No. 8

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

74. PLTD Lueng Bata – Banda Aceh 1 unit SULZER 12 ZV 40/48

Unit No. 7

Rehabilitation PT. PLN (Persero)

Pembangkitan Sumatera Bagian Utara

2012
75. PLTD Paokmotong – Lombok Timur 1 unit NIIGATA 16 V 27.5

Unit No. 1

Dismantling &

Investigation

PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

76. PLTD Ampenan – Lombok Barat 1 unit SULZER 12 ZV 40/48

Unit No. 1

Repair bearing cap MJ no. 4 PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

77. PLTD Paokmotong – Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 2

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

78. PLTD Paokmotong – Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 2

Base-plate replacement PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

79. PLTD Paokmotong – Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 3

Base-plate replacement PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

80. PLTD Tenau – Kupang (NTT) 1 unit SULZER 12 ZV 40/48 Major Overhaul PT. PLN (Persero)

Sektor Pembangkit-an Timor

PT. PLN (Persero)

Wilayah NTT

81. PLTD Sei Kledang – Samarinda 1 unit SULZER 12 ZV 40/48

Unit No. 7

Repair eng.block

Grinding c/p

PT. PLN (Persero)

Sektor Mahakam

PT. PLN (Persero)

Wilayah Kaltim

2013
82. PLTD Paokmotong – Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 3

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

83. PLTD Paokmotong – Lombok Timur 1 unit SULZER 12 ZV 40/48

Unit No. 4

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

84. PLTD Ampenan – Lombok Barat 1 unit SULZER 12 ZAV 40S

Unit No. 7

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

85. PLTD Ampenan – Lombok Barat 1 unit SULZER 12 ZV 40/48

Unit No. 3

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

2014
86. PLTD Ampenan – Lombok Barat 1 unit SULZER 12 ZAV 40S

Unit No. 6

Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

87. PLTD Tenau Kupang 1 unit SULZER 12 ZV 40/48 Repair Bearing & Cylinder Liner PT. PLN (Persero)

Sektor Pembangkit-an Timor

PT. PLN (Persero)

Wilayah NTT

88. PLTD Ampenan – Lombok Barat 1 unit SULZER 12 ZAV 40S

Unit No. 8

Semi Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

2015
89. PLTD Ampenan

Lombok Barat

1 unit SULZER 12 ZAV 40S

Unit No. 8

Semi Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

2016
90. PLTD Sei Raya – Pontianak 1 unit SULZER 12 ZAV 40S

Unit No. 6

Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

91. PLTD Siantan –  Pontianak 1 unit SWD 9 TM 410 Unit No. 2 Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

92. PLTD Siantan –  Pontianak 1 unit SWD 18 TM 410 Unit No. 4 Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

93. PLTD Siantan –  Pontianak 1 unit SULZER 12 ZAV 40S Unit No. 6 Honing Cylinder Liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

94. PLTD Siantan –  Pontianak 1 unit SWD 9 TM 410 Unit No. 2 Honing Cylinder Liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

95. PLTD Siantan –  Pontianak 1 unit Caltelpilar 16 CM 32 Unit No. 7 & 8 Machining Landing Seat Liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

96. PLTD Siantan –  Pontianak 1 unit Caltelpilar 16 CM 32 Unit No. 7 & 8 Honing Cylinder Liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

97. PLTD Siantan –  Pontianak 1 unit SULZER 12 ZAV 40S Unit No. 5 Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

98. PLTD Siantan –  Pontianak 1 unit SULZER 12 ZAV 40S Unit No. 3 Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

99. PLTD Siantan –  Pontianak 1 unit SWD 18 TM 410 Unit No. 4 Honing Cylinder Liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

100. PLTD Ampenan – Lombok 1 unit SULZER 12 ZAV 40S Unit No. 2 Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

2017
101. PLTD Pringgabaya – Lombok 1 unit SULZER 12 ZAV 40S Unit No.8 Top Overhaul PT. PLN (Persero)

Wilayah NTB

PT. Sumber Rejeki Power
102. PLTD Pringgabaya – Lombok 1 unit SULZER 12 ZAV 40S Unit No.4 Major Overhaul PT. PLN (Persero)

Wilayah NTB

PT. Sumber Rejeki Power
103. PLTD Siantan –  Pontianak 1 unit SWD 18 TM 410 Unit No.3 Service Roker arm PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

104. PLTD Pringgabaya – Lombok 1 unit SULZER 12 ZAV 40S Unit No.3 Top Overhaul PT. PLN (Persero)

Wilayah NTB

PT. Sumber Rejeki Power
105. PLTD Sei Raya – Pontianak 1 unit SWD 18 TM 410 Unit No. 5 Honing Cylinder Liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

106. PLTD Siantan –  Pontianak 1 unit SWD 18 TM 410 Unit No.3 Recesses lower dan cutting landing seat liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

107. PLTD Siantan –  Pontianak 1 unit SWD 18 TM 410 Unit No.3 Grinding Crankpin PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

108. PLTD Siantan –  Pontianak 1 unit SWD 18 TM 410 Unit No.7 Grinding Crankpin PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

109. PLTD Paokmotong – Lombok 1 unit SULZER 12 ZV 40/48 Unit No. 5 Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

110. PLTD Sei Raya – Pontianak 1 unit SWD 18 TM 410 Unit No. 2 Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

111. PLTD Sei Raya – Pontianak 1 unit SWD 18 TM 410 Unit No. 4 Major Overhaul PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

112. PLTD Ampenan – Lombok 1 unit SULZER 12 ZAV 40S Unit No. 1 Semi Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

113. PLTD Paokmotong – Lombok 1 unit SULZER 12 ZV 40/48 Unit No. 2 Top Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

114. PLTD Paokmotong – Lombok 1 unit SULZER 12 ZV 40/48 Unit No. 4 Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

2018
115. PLTD Paokmotong – Lombok 1 unit SULZER 12 ZV 40/48

Unit No.4

Base-plate replacement PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

116. PLTD Paokmotong – Lombok 1 unit SULZER 12 ZV 40/48

Unit No.4

Rotor generator PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB

117. PLTD Ampenan – Lombok 1 unit SULZER 12 ZAV 40S Unit No.8 Semi Overhaul PT. PLN (Persero)

Sektor Lombok

PT. Darma Dwi Putra
118. PLTD Sei Raya – Pontianak 1 unit SWD 18 TM 410 Unit No.4 Honing Cylinder Liner PT. PLN (Persero)

Sektor Kapuas

PT. PLN (Persero)

Wilayah Kalbar

119. PLTD Ampenan – Lombok 1 unit SULZER 12 ZAV 40S Unit No.6 Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. Darma Dwi Putra
120. PLTD Ampenan – Lombok 1 unit SULZER 12 ZAV 40S Unit No.5 Major Overhaul PT. PLN (Persero)

Sektor Lombok

PT. Darma Dwi Putra
121. PLTD Ampenan – Lombok 1 unit SULZER 12 ZAV 40S Unit No.2 Top Overhaul PT. PLN (Persero)

Sektor Lombok

PT. PLN (Persero)

Wilayah NTB