TRANSMISSION & DISTRIBUTION

INSTALLATION OF MFO – FUEL SYSTEM

Contract

Year

Description of Services Location CLIENT
1. 2008 Installation 6,8 KM – 20 KV Power Cable

Package 1 / 05

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

2. 2008 Installation 8 KM – 20 KV Power Cable

Package 1 / 06

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

3. 2008 Installation 14 KM – 20 KV Power Cable

Package 1 / 012

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

4. 2009 Installation of MFO Fuel System

Supply & Erect

7 Unit Mirrless 12KV Major

2 Unit SWD 9 TM620

PLTD Pesanggaran

Denpasar – Bali

PT. Indonesia Power

Unit Bisnis Pembangkitan Bali

(UBP Bali)

5. 2010 Installation 14 KM – 20 KV Power Cable

Jalur : GI Teluk Naga / P. Baru – MPS 1

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

6. 2011 SKTM – JTM 20 kV

Area Bandengan

Supply & Erect

Jakarta PT. PLN (Persero)

Distribusi Jakarta & Tangerang

7. 2012 Supply & Installation – Line Bay 150 kV

Gardu Induk

Joint Operation with PT. Hasta Prajatama

GI Maninjau

GI Padang Luar

PT. PLN (Persero)

Penyaluran & Pusat Pengatur

Beban Sumatera (P3BS)

8. 2015 Supply & Installation – Busbar Protection

PLTU Jeranjang

PLTU Jeranjang PT PLN (Persero) Unit Induk Pembangunan – Mataram

 

Galery